EasyManuals Logo

GE GTD65EBPLDG Installation Instructions

GE GTD65EBPLDG
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
To produce steam, the dryer must connect to
the cold water supply. Since the washer must
also connect to the cold water, a “Y” connector
is inserted to allow both inlet hoses to make that
connection at the same time.
NOTE: Use the new inlet hoses provided; never use
old hoses.
1. Turn the cold water faucet off. Remove the
washer inlet hose from the washer fill valve
connector (cold).
2. Ensure the rubber flat washer is in place and
attach one female coupling of the short hose
onto the washer fill valve connector. Tighten by
hand until firmly seated.
3. Attach one male end of the “Y” connector to the
other female coupling of the short hose. Ensure
the rubber flat washer is in place. Tighten by
hand until firmly seated.
4. Insert the filter screen in the coupling of the
washer’s inlet hose. If a rubber flat washer is
already in place remove it before installing the
filter screen. Attach this coupling to one male end
of the ‘’Y’’ connector. Tighten by hand until firmly
seated.
5. Ensure the rubber flat washer is in place and
attach the dryer’s long inlet hose to one male
end of the ‘’Y’’ connector. Tighten by hand until
firmly seated.
6. Ensure the rubber flat washer is in place and
attach the other end of the dryer’s long inlet
hose to the fill valve connector at the bottom of
the dryer back panel. Tighten by hand until firmly
seated.
4
Installation Instructions
CONNECTING INLET HOSES
7. Using pliers, tighten all the couplings with an
additional two–thirds turn.
NOTE: Do not overtighten. Damage to the couplings
may result.
8. Turn the water faucet on.
9. Check for leaks around the ‘’Y’’ connector, faucet
and hose couplings.
WATER SUPPLY REQUIREMENTS
Hot and cold water faucets MUST be installed
within 42 in. (107 cm) of your washer’s water
inlet. The faucets MUST be 3/4 in. (1.9 cm) garden
hose-type so inlet hoses can be connected. Water
pressure MUST be between 10 and 120 pounds
per square inch. Your water department can
advise you of your water pressure.
NOTE: A water softener is recommended to reduce
buildup of scale inside the steam generator if the
home water supply is very hard.
CONNECTING INLET HOSES
(on some models)
CONNECTING INLET HOSES
(on some models) (cont.)

Other manuals for GE GTD65EBPLDG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE GTD65EBPLDG and is the answer not in the manual?

GE GTD65EBPLDG Specifications

General IconGeneral
Colorwhite, diamond gray
Dryer Capactity7.4 cubic feet
Number of Cycles4
Cycle Selectionsanti-bacterial, towels and sheets, antibacterial, bulky items, damp dry, extended tumble, jeans, mixed load, my cycle, quick fluff, sanitize, towels/ sheets
Optionsextended tumble
Stackableno
Ventingtrue, vented
Temperature Settings5
Temperature Selectionshigh, medium, low, extra low, no heat
Temperature Controlyes
Delay Startyes
Child Lockno
Cycle Signalyes
Interior Lightyes
Drying Rackno
Moisture Sensor Optionyes
Steamno
Smart Homeno
Voltage240 volts
Current24 amperes
Weight and Dimensions IconWeight and Dimensions
Depth30 1/2 inches
Height46 inches
Width27 inches
Net Weight107 pounds

Related product manuals