EasyManuals Logo

GE JSP46 Installation Instructions

GE JSP46
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
11
Final Check List
Installation Instructions
Operation Check List
Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.
Be sure power is in service to the building.
Check to be sure that all packing materials and tape on metal panel (if applicable) under
control knobs and drawer have been removed.
Check to make sure the Clock display is energized. If a series of horizontal red lines appear in
the display, disconnect power immediately. Recheck the range wiring connections. If change is
made to connections, retest again. If no change is required, have building wiring checked for
proper connections and voltage. It is recommended that the clock be changed if the red lines
appear.
Push down and turn any one of the four surface knobs to “MED” setting to observe that the
element glows within 15 seconds. Turn the knob off when glow is detected. If the glow is not
detected within the time limit, recheck the range wiring connections. If change is required,
retest again. If no change is required, have building wiring checked for proper connections and
voltage.

Other manuals for GE JSP46

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE JSP46 and is the answer not in the manual?

GE JSP46 Specifications

General IconGeneral
BrandGE
ModelJSP46
CategoryRanges
LanguageEnglish

Related product manuals