3–10 MULTILINK ML2400 ETHERNET COMMUNICATIONS SWITCH – INSTRUCTION MANUAL
INSTALLATION CHAPTER 3: INSTALLATION
3.4.4 Dielectric Strength (hi-pot) Testing
The shorting link between the and safety ground must be removed prior to the
dielectric strength test to protect the transient suppression circuitry of the power supply.
FIGURE 3–4: Dielectric strength testing