Warning:
Configur
e the hardware settings before the device is installed.
1. Refer to the safety section of the IED.
2.
Switch off the IED. Disconnect the power and all connections.
3. Before removing the front cover, take precautions to prevent electrostatic discharge damage according to
the ANSI/ESD-20.20 -2007 standard.
4. Wear a 1 MΩ earth strap and connect it to the earth (ground) point on the back of the IED.
E01019
5. Lift the upper and lower flaps. Remove the six screws securing the front panel and pull the front panel
outw
ards.
P54A/B/C/E Chapter 17 - Communications
P54xMED-TM-EN-1 359

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE P54B and is the answer not in the manual?

GE P54B Specifications

General IconGeneral
BrandGE
ModelP54B
CategoryRelays
LanguageEnglish

Related product manuals