GE MEDICAL SYSTEMS
D
IRECTION 2300164-100, REVISION 7 VIVID™ 3 PRO/VIVID™ 3 SERVICE MANUAL
Chapter 2 - Pre-Installation  2-1
Chapter 2
Pre-Installation
Section 2-1
Overview
2-1-1 Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the installation of a Vivid™ 3 
ultrasound unit. Included are descriptions of the electrical and facility requirements that must be met by 
the purchaser. A worksheet is provided at the end of this chapter (see 
Figure 2-2 on page 2-11) to help 
ensure that all the required network information is available, prior to installation.
Table 2-1    Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
Console Requirements
2-2
2-3
Facility Needs
2-7
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com