Fig.6: Anchoring details
A Drilled chemical anchor (M20)
B Grouted anchor recesses (M20)
1 Installed chemical anchor before placing the base frame
2
Installing chemical anchor after placing the base frame (base frame cannot be removed
easily)
3 Drilling angle
1.2.5.3 Mounting the base frame on a concrete block
General
After the space between base frame and concrete base has been filled-up with a
filling grout, the package base frame must be secured tightly to the foundation
block or floor.
INSTALLATION AND PREPARATION FOR USE
INSTALLATION
0089288gbr_11
18 30.10.2017