12 Mobile Link
Section 3 Air-cooled Installation
3.1 — Installation
1. Unlock both locks, open the generator’s lid and remove the
front panel.
2. Switch generator to OFF. Remove the generator panel fuse.
See Figure 3.1.
Figure 3.1 - Generator Controllers
Note: There are different controller configurations for various
model years.
3. Turn the main breaker in the home’s electrical panel into the
OFF position.
4. Remove the T1 fuse from the transfer switch.