EasyManua.ls Logo

Generac Power Systems Mobile Link Unit - Page 16

Generac Power Systems Mobile Link Unit
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 Mobile Link
8. Inspect the area behind the external breaker box to make sure
all wires are moved out of the way to prevent damage during
drilling. See Figure 3.4.
Figure 3.4 - Checking Wire Clearance
9. Using the template provided with these instructions, make a
1 1/8” hole just behind the breaker box. See Figure 3.5.
Note: 2013 and later models have a prepositioned dimple to
mark the center of the hole.
Figure 3.5 - Drilling Mounting Hole.

Related product manuals