Mobile Link 21
27. Flip the utility disconnect switch to simulate a power outage. The
generator should turn on. Allow to run for approximately 30 sec-
onds, then turn the utility switch back to restore utility service.
28. Verify that the Mobile Link unit’s middle and bottom LEDs are illumi-
nated. See Figure 3.18.
Figure 3.18 - Mobile Link unit LEDs