EasyManua.ls Logo

Genie Super Tower ST-25 User Manual

Genie Super Tower ST-25
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

Other manuals for Genie Super Tower ST-25

Question and Answer IconNeed help?

Do you have a question about the Genie Super Tower ST-25 and is the answer not in the manual?

Genie Super Tower ST-25 Specifications

General IconGeneral
BrandGenie
ModelSuper Tower ST-25
CategoryLifting Systems
LanguageEnglish

Summary

Safety Rules

Tip-over Hazards

Ensure outriggers are properly installed, base is level, and avoid operation in windy conditions.

Electrocution Hazards

Maintain safe distances from electrical power lines to prevent electrocution.

Crushing Hazards

Keep clear of pinch points and never place personnel under a raised load.

Pre-operation Inspection

Function Tests

Winch Operation Tests

Tests for one-speed and two-speed winch operation and brake engagement.

Mast Sequencing Test

Procedure to test the sequential raising and lowering of mast sections.

Workplace Inspection

Operating Instructions

Raising and Lowering Load

Procedures for centering, securing, raising, and lowering loads safely.

Load Capacity Charts

Load Positioning Instructions

Step-by-step guide on determining load weight, center, and placement on forks.

Load Capacity Chart

Table showing maximum load capacities for different load centers and models.

Transport Instructions

Related product manuals