EasyManua.ls Logo

Gerhardt Vap 30 - 4 Assembly and Installation; Setup

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C. Gerhardt GmbH & Co. KG
10
VAPODEST 30
3 Delivery
Check for transport damage
Before assembling the instrument please check if the contents of
the box is complete and intact!
In case of any damage, please notify your carrier (post, rail, road)
and obtain an expert’s report!
The exact contents of the delivery can be checked by the follo-
wing list.
Parts list
Distillation system Vapodest 30, complete
Tubing set:
1 x Water inlet tube 10/17mm with connections of 1/2 inch and
3/4 inch, 2m
1 x Verprene tube 8/12 mm. 2 m
2 x PVC tube 4/7 mm, 2 m
2 x PVC tube 8/12 mm, 2m
2 x PVC pipe 6 x 1 mm, 420 mm
1 x PVC pipe 10 x 1 mm, 420 mm
1 x Mains cable
1 x Kjeldatherm digestion tube 250 ml or 100 ml

Related product manuals