EasyManua.ls Logo

gerkros KST - Connecting the boiler to heating system; Connecting the boiler to gas pipeline

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
Connectingtheboilertoheatingsystem
Connectingtheboilertohotwaterpiping
Connectingtheboilertogaspipeline
ATTACKboilersserveforheatingsystemswithforcedcirculation.Rateofwaterflowcanbesetby
theswitchonthepump.Beforefillingtheheatingsystemwithwater,itisnecessarytocleanthe
systemproperly.Heatersanddistributionmustbeflushedoutseveraltimes.Forthoroughflushing
andcleaningoftheheatingsystemwerecommendtousecleaningagents.Ontheinletfromheating
systemtotheboiler,afiltermustbemounted.Werecommendbrassfilterswithsidecleaning.The
filtersmustbecleanedregularlyaccordingtofouling.Maintenanceoftheboileriseasierwhenonthe
inletaswellasontheoutletofheatingthereisavalve.Filtersandvalvesarenotdeliveredasboiler
accessories.Theheatingsystemmustalsobeequippedwithafeedingvalvewithnon-returnflapvalve
connectedtowaterpipingthatservesforfeedingandpressurizingtheheatingsystem.
Thehardnessofwaterintheheatingsystemisnotrecommendedhigherthan3mval/l.Intheboiler
thereisa7-litrepressureexpansiontankenablingconnectingtoaclosedheatingsystem.Ifitis
requiredbythesizeoftheheatingsystem,anotherpressureexpansiontankistobemounted.The
recommendedtemperaturedifferencebetweenoutcomingandincomingheatingwaterfromthe
boileris15-20°C.Forreconstructionofheatingoranewsystemwerecommendsmall-volume
heatersanddistributionsinthesmallestdimensionsregardingtofastriseofthesystemtothe
temperatureandquiteabigflexibilityofthesystem.Processofwaterfilling:whenfillingwithwater,
theboilermustbedisconnectedfromelectricity,deareatingvalvesontheboilerandheatingsystem
mustbeopen.Setthesystemtothepressureof1bar,thendeareateandsettothepressureagain.
Heatingsystemmustsuittovaluablestandardsandmeasures:
STN060310Projectandassemblyofcentralheating
STN060830Equipmentforcentralheating
ThesizeofexpansiontankbySTN060830iscalculatedbyformula:
V=V.v.1.3
V=volumeoftheexpansiontank
V=volumeofheatingwaterinthecircuit
v=proportionalgrowthofvolumeafterheatingtotIft=80°C,v=0.029
Ifthevolumeoftheexpansiontankishigherthan7litres,itisnecessarytoaddanotherexpansion
tankwithminimumsizeequaltocalculateddifference.Becauseofmaximumutilizationof
condensationeffectitisnecessaryfortheheatingsystemtobedimensionedtotemperaturedropof
50/30°C.Theboilerisequippedwithasiphonthatbeforestartmustbeflushedoutwithwaterof
about100ml.Theoutletfromthesafety3barvalveisnecessarytoconnecttothedischarge
piping.
ConnectingtheboilertohotwaterpipingmustbedoneinaccordancewiththestandardSTN06
0830.Thepipingmustbeequippedwithallthedeterminedfittings.Maximumfeedingpressureof
hotwateris6bar.Hardnessandcompositionofwatermustsuittovalidstandardsfordrinking
water.
Beforeconnectingaboilertothegaspipeline,thepipelinemustbetestedandadjusted.After
connectingtoaboiler,allthegasconnectorsmustbetested,includingpipingandfittingsinthe
boiler.Boltedconnectionsofthegaspipelineaswellasthoseofthewaterpipingandheating
waterpipingmustnotbestressedbyanyadditionalforce.Gasinstallationmustbedoneaccording
tothestandardSTNEN1775.
Guaranteedoesnotapplytothecasesofcloggingtheexchangerorpumpbyimpuritiesfromthe
system.
C
C
mm
Guaranteedoesnotapplytothecasesofincrustationoftheheatexchangerorpump.

Related product manuals