10
Examples of installation
NRG 26-21
Fig. 4 Protection tube (provided on site) for
installation inside the boiler
Fig. 5 Protection tube (provided on site) for
installation inside the boiler
Fig. 6 Protection tube (provided on site) for installation
inside the boiler and in combination with other
GESTRA equipment