22
An arrangement as shown below normally satisfies the requirements for
dewatering, filtration and monitoring facilities when supplying a
sterilizer with steam from a main steam supply line.
1 High-pressure line 8 Vent
2 Labyrinth diverter / separator 9 Ball valve
3 Shut-off valve 10 Steam trap
4 Filter 11
Remote-controlled valve
5 Reducing valve 12 Check valve
6 Safety valve 13 Sterilizer
7 Pressure gauge
Feed line in the ceiling (bilder skall ändras 12 t.h. om 4)
Supply line in floor or in the storey below (ändr)