EasyManua.ls Logo

GILBARCO VEEDER-ROOT Encore 500 Series User Manual

Default Icon
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Encore
®
Installation Manual
MDE-3985L

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GILBARCO VEEDER-ROOT Encore 500 Series and is the answer not in the manual?

GILBARCO VEEDER-ROOT Encore 500 Series Specifications

General IconGeneral
CategoryPetrol Station Equipment
ManufacturerGILBARCO VEEDER-ROOT
Model SeriesEncore 500 Series
Payment OptionsCredit/Debit, Contactless, Mobile Payments
Pump CapacityVaries depending on pump configuration.
Fuel Types SupportedGasoline, Diesel
ConnectivityEthernet, Wi-Fi, Cellular
CompatibilityWorks with various POS and back-office systems
FunctionalityFuel dispensing, payment processing, loyalty programs
CertificationsUL
Power Supply110-240V AC, 50/60Hz

Summary

Important Safety Information

Emergency Procedures and Lockout/Tagout

Guidance on emergency actions, including total electrical shut-off and lockout/tagout procedures.

Installation Procedures

Required Equipment and Materials

List of essential equipment and materials needed for proper installation.

NFPA 30A and NFPA 70 Compliance

Mandatory adherence to National Fire Protection Association codes for safety.

Before Placing Unit on Fuel Island

Crucial steps and considerations before mounting the unit onto the fuel island.

Connecting Pump/Dispenser Inlet Pipes

Instructions for correctly connecting pump and dispenser inlet pipes, including shear valves.

Anchoring Pump/Dispenser to Island

Procedure for securely anchoring the pump/dispenser to the island structure.

Sealing Air Gaps and Conduits

Mandatory sealing of conduits and air gaps in Encore units for safety and integrity.

Installing Breakaways, Hoses, Swivels, Nozzles

Detailed instructions for installing hose hardware, emphasizing safety and proper assembly.

Purging Air from System

Procedures for purging air from the system, covering both shear valve and nozzle methods.

Installation Checklists

Requirement to complete MDE-4226 checklist for proper operation and warranty coverage.

Calibration Procedure for 500/500 S Units

Steps to verify calibration and seal wire units to prevent tampering.

Reference Information for Installers

Electrical Requirements Overview

Essential electrical requirements, codes, and safety practices for installation.

Shear Valve Installation and Usage

Information on shear valve selection, installation, and mandatory usage for dispensers.

Related product manuals