Do you have a question about the Glow-worm Micron 50FF and is the answer not in the manual?
Boiler tested to EN483 for safety and performance. No alterations allowed.
Procedure for reset if overheat safety limiter operates.
Installation must comply with UK/IE regulations and British Standards.
Gas installation requirements in GB (BS6891) and IE (I.S.813).
Boiler must be earthed; connection in accordance with BS7671 and local regulations.
Minimum operational and servicing clearances required around the boiler.
Minimum acceptable siting dimensions for the flue terminal.
Installation requirements for sealed water systems.
Requirements for fitting a preset, nonadjustable safety valve.
Guidance on diaphragm type expansion vessels for sealed systems.
Determining flue application, length, and terminal position.
Steps for fitting fan elbow, retaining clamp, and flue duct.
Making the gas connection and testing installation for soundness.
Electrical safety checks, insulation resistance, earth continuity, and polarity tests.
Procedure for fitting blanking plate, flue spigot, and securing the boiler.
Wiring instructions, including earthing and cable securing.
Commissioning procedure for all systems, including flushing and filling.
Checks for fan operation, ignition sequence, and flame supervision.
Testing for gas soundness, burner gas pressure, and gas rate.
Procedure for initial lighting, testing gas cock, and electrical supply.
Procedure for obtaining products of combustion reading using an analyser.
Importance of repeating earth continuity, polarity, and short circuit checks after work.
Table detailing LED status and corresponding fault conditions.
Procedure for replacing the electrical thermistor.
Procedure for replacing the multifunctional control unit.
Procedure for replacing the safety temperature limiter.
Procedure for replacing the control board (PCB).