EasyManua.ls Logo

Goodman ARUF**14 Series User Manual

Goodman ARUF**14 Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
ATTENTION INSTALLING PERSONNEL
Prior to installation, thoroughly familiarize yourself with this Installation Manual.
Observe all safety warnings. During installation or repair, caution is to be observed.
It is your responsibility to install the product safely and to educate the customer on its safe use.
ARUF**14**/ARPT**14**
1 Important Safety Instructions
The following symbols and labels are used throughout this
manual to indicate immediate or potential safety hazards. It
is the owner’s and installer’s responsibility to read and com-
ply with all safety information and instructions accompanying
these symbols. Failure to heed safety information increases
the risk of personal injury, property damage, and/or product
damage.
ASPT**14**/ASUF**14**
AIR HANDLERS INSTALLATION & OPERATING INSTRUCTIONS
Contents
1 Important Safety Instructions .................................. 1
2 Shipping Inspection ................................................. 2
2.1 Parts ........................................................................3
2.2 Handling ..................................................................3
3 Codes & Regulations................................................ 3
4 Replacement Parts ................................................... 3
5 Pre-Installation Considerations .............................. 3
5.1 Preparation ..............................................................3
5.2 System Matches ......................................................3
5.3 Interconnecting Tubing ............................................3
5.4 Clearances ..............................................................3
5.5 Horizontal Applications ............................................4
6 Installation Location ................................................ 4
6.1 Upflow Installation....................................................4
6.2 Horizontal Left Installation .......................................4
6.3 Downflow/Horizontal Right Installation ....................5
7 Refrigerant Lines ...................................................... 7
7.1 Tubing Size ..............................................................7
7.2 Tubing Preparation ..................................................7
7.3 Special Instructions .................................................8
7.4 Tubing Connections for Flowrator Model .................8
7.5 Tubing Connections for TXV Models .......................8
8 Condensate Drain Lines........................................... 9
9 Ductwork ................................................................... 9
9.1 Return Ductwork ......................................................9
10 Return Air Filters .................................................. 10
11 Electric Heat .......................................................... 10
12 Electrical and Control Wiring............................... 12
12.1 Building Electrical Service Inspection .................. 12
12.2 Wire Sizing..........................................................12
12.3 Maximum Overcurrent Protection (MOP) ............12
12.4 Electrical Connections – Supply Voltage .............13
12.4.1 Air Handler Only (Non-Heat Kit Models) ....13
12.4.2 Air Handler - Non-Circuit Breaker Heat Kits .....13
12.4.3 Air Handler With Circuit Breaker Heat Kit.........13
12.5 Low Voltage Connections ....................................13
12.5.1 Thermostats ....................................................13
12.6 Speed Tap Adjustment.........................................13
13 Achieving 2% Low Leakage Rate ........................ 14
14 Start-Up Procedure ............................................... 14
15 Regular Maintenance............................................ 14
16 Airflow Data .......................................................... 15
21 Wiring Diagrams................................................... 21
IO-427K
10/2014
Question and Answer IconNeed help?

Do you have a question about the Goodman ARUF**14 Series and is the answer not in the manual?

Goodman ARUF**14 Series Specifications

General IconGeneral
ModelARUF**14 Series
TypeAir Handler
RefrigerantR-410A
Cabinet MaterialGalvanized Steel
Motor TypePSC or ECM
Phase1
DimensionsVaries by model
ConfigurationUpflow/Horizontal
Cooling Capacity1.5 - 5 Tons
Coil TypeAluminum
Voltage208/230V
InsulationFoil-faced insulation
Filter TypeStandard or Optional
HeightVaries by model
WidthVaries by model
DepthVaries by model
Shipping WeightVaries by model
WeightVaries by model
Blower MotorMulti-speed or Variable Speed (ECM)

Summary

General Safety and Pre-Installation

Important Safety Instructions

Key safety warnings and precautions for installation and operation.

Pre-Installation Considerations

Essential checks and preparations before starting the installation process.

Refrigerant Line Management

Tubing Sizing and Preparation

Guidelines for selecting correct tubing size and preparing ends for brazing.

Refrigerant Line Connections

Condensate Drainage and Ductwork

Condensate Drain Line Setup

Proper installation of drain lines, including pitch, traps, and secondary drains.

Air Handler Features and Electric Heat

Electric Heat Kit Installation

Guidelines for installing approved electric heat kits (HKS series).

Electric Heat Kit Compatibility and Data

Heat Kit Nominal kW Data

Tables detailing heat kit kW ratings for various models and airflow.

Minimum CFM for Heat Kits

Tables specifying the minimum airflow required for different heat kit sizes.

Electrical and Wiring Requirements

Wire Sizing and Voltage Drop Rules

Proper wire gauge selection to prevent voltage drop and ensure capacity.

Maximum Overcurrent Protection (MOP)

Requirements for selecting and installing overcurrent protection devices.

Electrical Connections and Low Voltage Wiring

Supply Voltage Connection Procedures

Connecting the main power supply conductors to the unit.

System Start-Up and Maintenance

Pre-Start-Up Checklist

A comprehensive list of checks before energizing the unit for operation.

Low Voltage Wiring Diagrams

Single-Stage Cooling/Heat Pump Wiring

Diagrams for cooling and heat pump units with optional heat kits.

Cooling Unit with Heat Kit Wiring

Wiring configuration for cooling units featuring optional heat kits.

Heat Pump and Cooling Wiring Schematics

Cooling Unit with High kW Heat Kits Wiring

Wiring for cooling units with higher kW heat kits and two-stage heating.

Heat Pump Unit with Low kW Heat Kits Wiring

Wiring for heat pump units with lower kW heat kits and outdoor thermostats.

Heat Pump Unit Wiring Diagrams

ARUF/ARPT Model Wiring Diagrams

ASPT/ASUF Model Wiring Diagrams

3-Phase Heat Kit Installation

3-Phase Heat Kit Wiring Diagram

Electrical schematic for the installation of a 3-phase heat kit.

Related product manuals