EasyManua.ls Logo

Goodman GMV series - Page 126

Goodman GMV series
131 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
126
SERVICING
a. BEFORE replacing the ECM motor assembly or the
end bell, first check the motor with a GE TECMate
PRO tester. If the motor runs with the tester, the
motor is good. To check the end bell, see the previ-
ous variable speed testing section of this manual be-
fore replacing the end bell.
b. The two-stage variable speed furnaces should have
120 Volts at the motor at all times, even without a
call for cooling or heating. These motors receive their
operational signals (24 Volts) through the 16-pin wir-
ing harness, connected between the motor and inte-
grated control board. NOTE: For complete trouble-
shooting information on units using the ECM/ICM
blower motors, refer to the servicing section - Check-
ing Air Circulator Blowers (S-16B and S-16C) in this
service manual.
Goodman® and Amana® Distinctions™ Brand 80% and
90% Single-Stage (GDS8, GHS8, GMS8, GCS9, GMS9,
GMS95, DDS8, DHS8, DMS8, DCS9, DMS9)
NOTE: The models above use White-Rodgers 50A55-
289 ignition control board.
L
INE VOLTAGE NOW PRESENT
WARNING
These tests must be completed within a given time frame
due to the operation of the ignition control.
1. Check for 120 volts from Line 1 (Hot) to Line 2 (Neutral)
at the ignition control. No voltage, check the door switch
connections and wire harness for continuity.
2. Check for 24 volts from W to C terminal on the ignition
control. No voltage. Check transformer, room thermo-
stat, and wiring.
If you have 24 volts coming off the transformer but re-
ceive approximately 13 volts on the terminal board be-
tween (C) and (R), check for blown fuse.
3. Check for 120 volts to the induced draft blower by mea-
suring voltage between Pin 1 (on the 2-pin connector)
and Line (Neutral) on the control board. No voltage, re-
place ignition control.
4. If voltage is present in Steps 1 through 3 and the in-
duced draft blower is operating, check for 120 volts to
the ignitor during the preheat cycle. Measure voltage
between Pin 2 (on the 2-pin connector) and Line (Neu-
tral) on the control board. No voltage, check pressure
switch.
5. After the ignitor warmup time, begin checking for 24 volts
to the gas valve. Voltage will be present for seven sec-
onds only if proof of flame has been established.
B18099-26
ON
1
2
E17
K2
ST4
DS2 DS1
S1
ST3
E16
E32
E31
E27
E28
E18
E14
E13
E20
E11
E10
E9
E7
E8
DS2
HEAT-H
COOL-H
DS1
2
ONOFF
4
3
1
LINE NEUTRAL
G
TWIN Y W R C
G
TWIN
RW
YC
W125
EAC-H XFMR-H
HUM-H
PARK PARK
LINE-H
0130F00005
GDS8, GHS8, GMS8, GCS9, GMS9, GMS95, DDS8,
DHS8, DMS8, DCS9, DMS9)
(WR50A55-289)
Goodman® 80% and 90% Two-Stage (GMV8, GCV9,
GMV9, GMV95)
NOTE: The models above use White-Rodgers 50V51-289
ignition control board.
1. Check for 120 volts from Line 1 (Hot) to Line 2 (Neutral)
at the ignition control. No voltage, check the door switch
connections and wire harness for continuity.
2. Check for 24 volts from W1 to C terminal on the ignition
control. No voltage. Check transformer, room thermo-
stat, and wiring.
If you have 24 volts coming off the transformer but re-
ceive approximately 13 volts on the terminal board be-
tween (C) and (R), check for blown fuse.
3. Check for 120 volts to the induced draft blower (low-
stage) by measuring voltage between Pin 3 and Pin 4
(on the 5-pin connector) located on circuit board. No
voltage, check for loose connection in the 5-pin connec-
tor or replace ignition control.
Check for 120 volts to the induced draft blower (high-
stage) by measuring voltage between Pin 2 and Pin 4
(on the 5-pin connector) located on circuit board. No
voltage, check for loose connection in the 5-pin connec-
tor, no call for high stage heat or replace ignition con-
trol.

Related product manuals