EasyManua.ls Logo

Goodman GMV series User Manual

Goodman GMV series
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
80%, 90%, 95% Gas Furnaces
& Accessories
ACS, ACV, ADS, ADV, AMH, AMS, AMV, DCS, DDS,
DHS, DMS, GCH, GCS, GDH, GDS, GCV, GHS, GKS,
GME, GMH, GMS, GMV
RS6610004 Rev. 2
November 2007
Service
Instructions
This manual is to be used by qualified, professionally trained HVAC technicians only. Goodman does
not assume any responsibility for property damage or personal injury due to improper service
procedures or services performed by an unqualified person.
Copyright © 2006-2007 Goodman Manufacturing Company, L.P.
www.goodmanmfg.com www.amana-hac.com
Question and Answer IconNeed help?

Do you have a question about the Goodman GMV series and is the answer not in the manual?

Goodman GMV series Specifications

General IconGeneral
BrandGoodman
ModelGMV series
CategoryFurnace
LanguageEnglish

Summary

Service Instructions

Product Identification

Operating Instructions

For Your Safety Read Before Operating

Crucial safety guidelines before operating the furnace.

What to Do If You Smell Gas

Emergency procedures for gas leaks, critical safety information.

Product Design

Safety

Essential safety precautions for installation and operation.

Combustion and Ventilation Air Requirements

Critical information on air supply needed for safe combustion.

Propane Gas and/or High Altitude Installations

Instructions for converting to propane or installing at high altitudes.

System Operation

HEATING - Abnormal Operation

Troubleshooting common heating issues and diagnostic codes.

START-UP PROCEDURE AND ADJUSTMENT

Steps for initial setup and adjustment of the furnace.

Troubleshooting Chart

Maintenance

Servicing

S-1 CHECKING VOLTAGE

Steps for measuring electrical voltage at key points.

S-16A CHECKING AIR CIRCULATOR BLOWER MOTOR (PSC & ECM)

Procedures for testing blower motors, including PSC and ECM types.

VARIABLE SPEED (ECM) MOTOR TEST (Low Stage Heat Call)

Testing ECM motor for low-stage heating call.

S-300 CHECKING PRIMARY LIMIT CONTROL

Steps for testing the primary limit control switch.

S-301 CHECKING AUXILIARY LIMIT CONTROL

Procedures for testing the auxiliary limit control switch.

S-302 CHECKING FLAME ROLLOUT CONTROL

Steps to check and test the flame rollout safety control.

S-307 CHECKING GAS PRESSURE

Measuring and adjusting gas supply and manifold pressures.

S-313 CHECKING INTEGRATED IGNITION CONTROL BOARDS

Troubleshooting integrated ignition control boards.

S-314 CHECKING FLAME SENSOR

Testing the flame sensor for proper combustion proof.

Related product manuals