EasyManua.ls Logo

Goodman GMV95 - Non-Direct Vent (Single Pipe) Piping; Vent;Flue Pipe Lengths and Diameters

Goodman GMV95
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
12345678
45,000 2 7168656259565350
2 4946434037343128
3 7168656259565350
90,000 3 7168656259565350
115,000 3 49 46 43 40 37 34 31 28
12345678
2 6158555249464340
3 7168656259565350
2 6158555249464340
3 7168656259565350
70,000
70,000
90,000
COUNTERFLOW
Non-Direct Vent (Single Pipe)
Maximum Allowable Length of Vent/Flue Pipe (ft)
(1)(2)
Unit Input
Pipe
(4)
(inch)
Number of Elbows
(3)(5)
UPFLOW
Non-Direct Vent (Single Pipe)
Maximum Allowable Length of Vent/Flue Pipe (ft)
(1)(2)
Number of Elbows
(3)(5)
Pipe
(4)
(inch)
Unit Input
1) One 90° elbow should be secured to the combustion air intake con-
nection.
2) Minimum requirement for each vent pipe is five (5) feet in length and
one elbow/tee.
3) Tee used in the vent/flue termination must be included when determin-
ing the number of elbows in the piping system.
4) 3” diameter pipe can be used in place of 2” diameter pipe.
5) Increased Clearance Configurations using (2) 45 deg.
Long Sweep
elbows should be considered equivalent to one 90 deg. elbow.
VENT/FLUE PIPE TERMINATIONS
The vent/flue pipe may terminate vertically, as through a roof, or
horizontally, as through an outside wall.
Vertical vent/flue pipe terminations should be as shown in the fol-
lowing figure. Refer to Section IX, Vent/Flue Pipe and Combustion
Air Pipe - Termination Locations for details concerning location re-
strictions. The penetration of the vent through the roof must be
sealed tight with proper flashing such as is used with a plastic plumb-
ing vent.
Horizontal vent/flue pipe terminations should be as shown in the
following figure. Refer to Section IX, Vent/Flue Pipe and Combus-
tion Air Pipe - Termination Locations for details concerning loca-
tion restrictions. A 2 3/8” diameter wall penetration is required for
2” diameter pipe while a 3 1/2” diameter hole is required for 3”
diameter pipe. To secure the pipe passing through the wall and
prohibit damage to piping connections, a coupling should be in-
stalled on either side of the wall and solvent cemented to a length
of pipe connecting the two couplings. The length of pipe should be
the wall thickness plus the depth of the socket fittings to be in-
stalled on the inside and outside of the wall. The wall penetration
should be sealed with silicone caulking material.
In a basement installation, the vent/flue pipe can be run between
joist spaces. If the vent pipe must go below a joist and then up into
the last joist space to penetrate the header, two 45° elbows should
be used to reach the header rather than two 90° elbows.
ADDITIONAL
PLUG FROM
DRAIN KIT
SECURE
TO CABINET
UPFLOW/HORIZONTAL SHOWN
(COUNTERFLOW SIMILAR)
REMOVE
3 SCREWS
REMOVE
4 SCREWS
REMOVE
4 SCREWS
REMOVE
AND
RELOCATE
.
REMOVE
AND
RELOCATE
REMOVE
AND CUT
REMOVE
UPFLOW
COUNTERFLOW
5
4
1
2
2
3
3
1
1
3
2" CLEARANCE
REQUIRED
(NON-DIRECT
VENT)
5
Alternate Combustion Air Intake Location
NON-DIRECT VENT (SINGLE PIPE) PIPING
Non-direct vent installations require only a vent/flue pipe. The
vent pipe can be run horizontally with an exit through the side of
the building or run vertically with an exit through the roof of the
building. The vent can also be run through an existing unused
chimney; however, it must extend a minimum of 12 inches above
the top of the chimney. The space between the vent pipe and the
chimney must be closed with a weather-tight, corrosion-resistant
flashing. For details concerning connection of the vent/flue pipe to
the furnace, refer to Section IX, Vent/Flue Pipe and Combustion
Air - Standard Furnace Connections or Alternate Furnace Connec-
tions for specific details. Refer to the following Non-Direct Vent
(Single Pipe) Piping - Vent/Flue Pipe Terminations for specific de-
tails on termination construction.
Although non-direct vent installations do not require a combustion
air intake pipe, a minimum of one 90° elbow should be attached to
the furnace’s combustion air intake if: an upright installation uses
the standard intake location, or a horizontal installation uses the
alternate air intake location. This elbow will guard against inad-
vertent blockage of the air intake.
VENT/FLUE PIPE LENGTHS AND DIAMETERS
Refer to the following table for applicable length, elbows, and pipe
diameter for construction of the vent/flue pipe system of a non-
direct vent installation. In addition to the vent/flue pipe, a single
90° elbow should be secured to the combustion air intake to pre-
vent inadvertent blockage. The tee used in the vent/flue termina-
tion must be included when determining the number of elbows in
the piping system.

Table of Contents

Other manuals for Goodman GMV95

Related product manuals