EasyManua.ls Logo

Gram BIOBASIC 210 - Installation; Initial Setup Steps

Gram BIOBASIC 210
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
|
BIOBASIC MANUAL
Installation
Due to safety and operating reasons, the cabinet must not be used
outdoors. The cabinet should be installed in a dry and suciently
ventilated area. To ensure ecient operation, the cabinet should not be
installed in direct sunlight or close to heat sources.
Avoid placement of the cabinet in a chloric/acidic environment due to
risk of corrosion.
Clean the cabinet with a mild soap solution prior to use.
If the cabinet has been laying down (e.g. during transport.).
The cabinet must stand up-right for 24 hours prior to being turned on.
Initial setup steps
Certain cabinets are shipped
with a protective lm that
should be removed prior to
putting the cabinet into service.

Related product manuals