EasyManua.ls Logo

Grant 50/70 - Electricity Supply

Default Icon
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Grant Vortex Indoor/Utility, System and Boiler House Oil Boilers
4.4.6 Two pipe oil supplies
Riello RDB burner - See Fig. 7
1 The fuel pump is supplied for use with a single
pipe fuel supply system. For use on a two pipe
system, it is necessary to fit the By-pass screw (see
Fig. 7) into the tapping in the return port.
2 The By-pass screw is supplied in the boiler
accessory pack.
3 On all models except 155/200 and 200/240:
Remove the plastic burner cover (secured by two
screws).
On 155/200 and 200/240 models only:
Remove the plastic burner cover (secured by three
screws). For ease of access to the fuel pump, to fit the
by-pass screw and connect the oil lines, the burner can
be removed from the boiler. To do this, unscrew the
single nut at the top of the burner (using a 13 mm
spanner) and withdraw the burner from the boiler.
4 Remove and discard the blanking plug from the
return connection of the pump and fit the By-pass
screw using an hexagonal key.
5 Connect the return oil flexible fuel hose to the pump.
6 Connect the
3
/
8
" to
1
/
4
" BSP adaptor to the flexible
fuel hose.
7 Flexible fuel hoses and adaptors are available to
purchase from your local stockist.
Fig. 6 - Tiger loop 'de-aeration' device
4 - GENERAL BOILER INFORMATION
Fig. 7 - Riello RDB pump
1 Oil inlet connection
2 Return connection
3 By-pass screw
4 Pressure gauge connection
5 Pressure adjuster
6 Vacuum gauge connection
7 Solenoid
8 Supply to nozzle
1 A 230/240 V ~ 50 Hz mains supply is required.
The boiler must be earthed.
2 The supply must be fused at 5 Amp and there must
only be one common isolator for the boiler and
control system, providing complete electrical
isolation.
3 A fused double pole switch or a fused three pin
plug and shuttered outlet socket should be used for
the connection.
4 The power supply cable should be at least 0.75 mm²
PVC as specified in BS 6500, Table 16.
5 All the wiring and supplementary earth bonding
external to the boiler must be in accordance with
the current I.E.E. Wiring Regulations.
6 Any room thermostat or frost thermostat used must
be suitable for use on mains voltage.
7 In the event of an electrical fault after installation
of the boiler, the following electrical system checks
must be carried out:- Short circuit, Polarity, Earth
continuity and Resistance to earth.
Electricity supply
4.5
1/4" BSP female
connections
Tiger Loop
SUPPLY
TO PUMP
RETURN
FROM PUMP
SUPPLY
FROM TANK
1
2
3
4
5
6
7
8

Related product manuals