14
Grant Vortex Eco Utility Oil Boilers
4.4.6 Two pipe oil supplies
Riello RDB burner - See Fig. 7
1 The fuel pump is supplied for use with a single
pipe fuel supply system. For use on a two pipe
system, it is necessary to fit the By-pass screw (see
Fig. 7) into the tapping in the return port.
2 The By-pass screw is supplied in the boiler
accessory pack.
3 Remove the plastic burner cover (secured by two
screws). To gain access, it may be necessary to
remove the plinth - loosen the screw securing the right
hand side of the plinth, then withdraw the plinth
forward from the right and away from the case.
4 Remove and discard the blanking plug from the
return connection of the pump and fit the By-pass
screw using an hexagonal key.
5 Connect the return oil flexible fuel hose to the pump.
6 Connect the
3
/
8
" to
1
/
4
" BSP adaptor to the flexible
fuel hose.
7 Flexible fuel hoses and adaptors are available to
purchase from Grant Engineering (UK) Ltd.
Fig. 6 - Tiger loop 'de-aeration' device
4 - GENERAL BOILER INFORMATION
Fig. 7 - Riello RDB pump
1 Oil inlet connection
2 Return connection
3 By-pass screw
4 Pressure gauge connection
5 Pressure adjuster
6 Vacuum gauge connection
7 Solenoid
8 Supply to nozzle
1 A 230/240 V ~ 50 Hz mains supply is required.
Refer to Section 10 for connection details.
The boiler must be earthed.
2 The supply must be fused at 5 Amp and there must only
be one common isolator for the boiler and control
system, providing complete electrical isolation.
3 A fused double pole switch or a fused three pin
plug and shuttered outlet socket should be used for
the connection.
4 The power supply cable should be at least 0.75 mm²
PVC as specified in BS 6500, Table 16.
5 All the wiring and supplementary earth bonding
external to the boiler must be in accordance with
the current I.E.E. Wiring Regulations.
6 Any room thermostat or frost thermostat used must
be suitable for use on mains voltage.
7 In the event of an electrical fault after installation
of the boiler, the following electrical system checks
must be carried out:- Short circuit, Polarity, Earth
continuity and Resistance to earth.
Electricity supply
4.5
1/4" BSP female
connections
Tiger Loop
SUPPLY
TO PUMP
RETURN
FROM PUMP
SUPPLY
FROM TANK
1
2
3
4
5
6
7
8