EasyManua.ls Logo

GRAPHTEC gl200a - Page 34

GRAPHTEC gl200a
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GL200-UM-251-9370 5-7
5. INSPECTION AND CHECK PROCEDURES
Setting procedure
(1) Load the condition settings file GL2CondVT.CND from the USB memory device.
Measurement procedure (temperature accuracy)
(1) Connect to the zero controller with the (T) compensation leads.
Connect the (T) compensation leads to the CH2, CH4, CH6, CH8 and CH10 input terminals.
(2) Use the voltage generator to successively input the reference voltage signal for the 0˚C reference
temperature device (zero controller) according to the table below, then check that the level of
measurement is within the rating.
Input voltage precision ratings (Type T)
Temperature
Input voltage Standard
0 ˚C 0.000 mV -0.8 ˚C to +0.8 ˚C
(3) Connect to the zero controller with the (K) compensation leads.
Connect the (K) compensation leads to the CH3, CH5, CH7 and CH9 input terminals.
(4) Input the reference voltage signal for the 0˚C reference temperature device (zero controller) according
to the table below, then check that the level of measurement is within the rating.
Input voltage precision ratings (Type K)
Temperature
Input voltage Standard
0 ˚C 0.000 mV -1.0 ˚C to +1.0 ˚C

Related product manuals