EasyManua.ls Logo

Gree GK-H03NH3AS - Crane Way; Installation Positions and Clearances

Gree GK-H03NH3AS
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rooftop Packaged
9
4.4 Crane Way
(1) When removing the unit, two ropes are needed to hang the unit along the
four ways.
(2) In order to avoid the extrusion, between the ropes should be add
something to protect the unit (e.g. batten).
(3) Please use M12 to tight the support fundus.
4.5 Installation Positions and Clearances

Related product manuals