Rooftop Packaged
13
hours. After one week running, the tightness of the belt should be adjusted
again, we should routinely check it every 1-2 months; also ensure the test
results complying with the following table.
(
3
)
The adjustment of the tightness of the belt is shown in the following figure.
Loosen screws fixing motor on the base, move motor along the direction of
arrow as shown in the picture, and then fix the screw again.
(
4
)
The tightness level of belt is tested by tensiometer as shown in the following
figure, when reaches the deviation length, read the value on the meter, the
value should be in the category specified in the following table.