EasyManua.ls Logo

Gree GMV-280WM/E1-X

Gree GMV-280WM/E1-X
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
278
Gas/liquid separator
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
Diagram
Operation Procedure
2. Remove the electric
box.
●Disconnect internal and external
connecting lines of the electric
box.
●Protect the internal parts during
the disassembly.
3. Disassemble the
gas/liquid separator.
●Heat the connecting pipes of the
gas/liquid separator by acetylene
welding and then remove the
pipes.
Note: Avoid nearby parts from
being burnt during welding.
4. Remove the
gas/liquid separator.
●Unscrew and remove the
gas/liquid separator.

Table of Contents

Other manuals for Gree GMV-280WM/E1-X

Related product manuals