D.C. Inverter Multi VRF Modular 
55 
08_Confirm 
preheated 
compressor 
Preheat time for compressor is less than 
8h. 
Step 13: 
progress 09 is “Refrigerant judgments before startup” 
If  the  refrigerant  quantity  inside  the  system  meets  the  requirement  of  operation  startup, 
system will display as below and start next progress. 
09_Refrigerant 
judgments before 
startup 
System refrigerant is normal. Start next 
progress. 
If  there’s  no or not  enough  refrigerant  in  the  system  to  meet the requirement of operation 
startup, system  will display  U4 “refrigerant shortage protection” and fails to  start next  progress. 
Then check if there’s any leakage or add refrigerant inside until error eliminated. 
09_Refrigerant 
judgments before 
startup 
System refrigerant is not enough. System 
downtime equilibrium pressure is lower 
than 0.3MPa. 
Step 14: 
progress 10 is “Status judgments of outdoor valves before startup” 
If master unit displays below, status judgments are enabled. 
10_Status 
judgments of 
outdoor valves 
before startup   
Outdoor valves are being turned on. 
If unit detects that valve status is not normal, it will display as below: