EasyManua.ls Logo

Gree GMV-615WM/B-X - Page 205

Gree GMV-615WM/B-X
375 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GMV5 DC INVERTER VRF UNITS SERVICE MANUAL
202
Step 15: Fill refrigerant.
Before filling refrigerant, check its manufacturer, package, and print information. Besides, check
refrigerant pressure and quality against the saturation pressure / temperature list.
1. Measure and check the pressure of the entire refrigerant product against the saturation pressure /
temperature list. Verify temperature parameter. If the difference between the actual temperature and the
parameter value is 3°C or more, the refrige rant quality is unsatisfactory.
Open all valves in
order that the
vacuum pump
extracts air through
all the valves
Gas pipe
Liquid
pipe
Balance
pipe
Low pressure
check valve
Oil checking
valve
If the
maintenance
work involves
multiple parts,
extract air of the
balance pipe
independently

Table of Contents

Other manuals for Gree GMV-615WM/B-X

Related product manuals