EasyManuals Logo

Gree GMV-615WM/B-X Service Manual

Gree GMV-615WM/B-X
375 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #212 background imageLoading...
Page #212 background image
GMV5 DC INVERTER VRF UNITS SERVICE MANUAL
209
5. Install a new
four-way valve.
●Put the valve in a proper
position.
Weld the valve with the
pipeline.
●Before welding, cover the valve
with wet cloth to avoid internal
slide from being burnt and
prevent water from flowing in the
pipeline.
●During welding, charge
nitrogen into the pipes. The
pressure should be controlled
within 0.5±0.1 kgf/cm2 (relative
pressure).
6. Fix and wire the
electric box.
●Put the electric box back to
original position and screw it.
Connect all lines.
7. Check and install
the front panels.
●Check various parts and
connecting lines.
If no problem is found, hook
the front panels and tighten the
screws.

Table of Contents

Other manuals for Gree GMV-615WM/B-X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-615WM/B-X and is the answer not in the manual?

Gree GMV-615WM/B-X Specifications

General IconGeneral
BrandGree
ModelGMV-615WM/B-X
CategoryAir Conditioner
LanguageEnglish

Related product manuals