EasyManua.ls Logo

Gree GMV BACnet

Gree GMV BACnet
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GMV BACnet Gateway Technical Service Manual
5
3.EQUIPMENT INSTALLATION
3.1 PRODUCT SIZE AND SPATIAL SIZE FOR ELECTRIC
CONTROL CABINET INSTALLATION
3.1.1 PRODUCT SIZE
296mm
177mm
56mm
98.5mm
L × W × H296×177×56mm
3.1.2 SPATIAL SIZE FOR ELECTRIC CONTROL CABINET
INSTALLATION
BACnet gateway shall be installed in electric control cabinet; the front of gateway shall be
hung upward and fixed with 4 screws. See the following fig (for reference).
Warning! Power cord and communication line of BACnet gateway must conduct routing
separately(the distance shall be over 15cm); otherwise, it might lead to BACnet
gateway communication malfunction!
The thin dotted line is communication line and the thick dotted line is the heavy current wire,

Related product manuals