Chapter Debugging and Operation3. Pre-debugging Preparations
47
product and national and local security operation requirements. Rule-breaking operations are
prohibited;
It is forbidden to directly connect the compressor with power supply and forcibly power it on.
3. Pre-debugging Preparations
3.1 Required Tools for Debugging
1Shifting spanner
2Inner hexagon spanner
3Straight screwdriver
4Cross screwdriver
5System high and low pressure gauges for corresponding refrigerants
3.2 Required Files for Debugging
Debugging data record table
Engineering project name
Unit model
Debugging personnel
Debugging date
Rated capacity of outdoor
unit(kW)
Capacity of water tank
Max difference between
ODU and water tank(m)
Lift of pump
Debugging status: □ water heating
Status parameters
Unit
Before turning
on the unit
60min
ODU status parameters
Outdoor ambient
temperature
Power supply voltage
V
Suction temperature
Discharge temperature
Water tank parameters
Temperature of water
outlet pipe temperature
sensor
Temperature of water
tank temperature sensor
Debugging conclusion