Chapter Ⅲ Debugging and Operation(3. Pre-debugging Preparations)
47
product and national and local security operation requirements. Rule-breaking operations are
prohibited;
It is forbidden to directly connect the compressor with power supply and forcibly power it on.
3. Pre-debugging Preparations
3.1 Required Tools for Debugging
(1)Shifting spanner
(2)Inner hexagon spanner
(3)Straight screwdriver
(4)Cross screwdriver
(5)System high and low pressure gauges for corresponding refrigerants
3.2 Required Files for Debugging
Debugging data record table
Rated capacity of outdoor
unit(kW)
Max difference between
ODU and water tank(m)
Debugging status: □ water heating
Before turning
on the unit
Outdoor ambient
temperature
Temperature of water
outlet pipe temperature
sensor
Temperature of water
tank temperature sensor