EasyManua.ls Logo

Gree GUHD series - Page 128

Gree GUHD series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80DWFK6HULHV'&
,QYHUWHU6HUYLFH0DQXDO
125
5. Connect the new
4-way valve to the pipe.
Ɣ,QVWDOOWKHQHZZD\YDOYHWR
correct position.
Ɣ:KHQZHOGLQJWKHZD\YDOYH
please wrap the valve body with
wet cloth, thus to prevent the guide
inside the valve body from burn. Also
take care to prevent any water from
ÀRZLQJLQWRWKHSLSH
Ɣ:HOGE\FKDUJLQJQLWURJHQZLWKWKH
nitrogen pressure kept at 0.5±0.1kgf/
c(relative pressure).
6.Establish vacuum
inside the system
through liquid valve.
Ɣ(VWDEOLVKYDFXXPLQVLGHWKH
system through liquid valve.
7 Recharge the
refrigerant to the
system through liquid
valve.
Ɣ5HFKDUJHWKHUHIULJHUDQWWRWKH
system through liquid valve.
Ɣ7KHFKDUJHYROXPHPXVWEH
identical to the indications on
nameplate.
Removal and Installation of Fan and Motor
Note : Before the dismantlement of the motor, make sure the unit is powered off.
Step Illustration Handling Instruction
1 Loosen the grille.
Loosen the screws between
the grille and the back panel
with a screw driver.

Related product manuals