EasyManua.ls Logo

Gree GUHD series - Page 67

Gree GUHD series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80DWFK6HULHV'&
,QYHUWHU6HUYLFH0DQXDO
64
1.3.1 Before Installation
Ɣ
$IWHUUHFHLYLQJWKHPDFKLQHSOHDVHFKHFNIRUDQ\WUDQVSRUWGDPDJH,I¿QGLQJDQ\VXUIDFHRULQWHUQDO
damage, please immediately report to the transport company or equipment company in writing.
Ɣ
After receiving the machine, please check the unit and accessories in reference to the packing list.
(QVXUHWKDWWKHPRGHOLVFRUUHFWDQGWKHPDFKLQHLVLQJRRGFRQGLWLRQ3OHDVHDOVRFKHFNLIWKHVSHFL¿FDWLRQ
and quantity of accessory parts are correct.
Ɣ
Determine the correct handling route and methods, thus to avoid damaging the unit or causing
possible hazard. For the sake of protection and safety, it is suggested to move the unit with the packaging
box. Even though it is not permitted to do like this under special occasions, do not remove the packaging
box, thus to avoid loosening or falling during handling.
Ɣ
&RQ¿UPLIWKHLQVWDOOLQJIRXQGDWLRQLVVROLG:KHQWKLVXQLWLVWREHLQVWDOOHGRQWKHPHWDOVHFWLRQRIWKH
building, make sure that the electrical insulation must comply with applicable standards.
Ɣ
Ensure that the place of installation is far from the area where the inflammable or explosive
VXEVWDQFHVDUHVWRUHGWKXVWRDYRLGSRVVLEOHH[SORVLRQRU¿UHGXHWROHDNDJH
1.3.2 Installation Site
Ɣ
2EVWUXFWVKRXOGSXWDZD\IURPWKHLQWDNHRURXWOHWYHQWRIWKHLQGRRUXQLWVRWKDWWKHDLUÀRZFDQEH
blown though all the room.
Ɣ
Make sure that the installation had accord with the requirement of the schematic diagram of
installation spaces.
Ɣ
Select the place where can stand 4 times of the weight of the indoor unit and would not increase the
operating noise and oscillate.
Ɣ
The horizontally of the installation place should be guaranteed.
Ɣ
Select the place where is easy to drain out the condensate water, and connect with outdoor unit.
Ɣ
Make sure that there are enough space for care and maintenance. Make sure that the weight
between the indoor unit and ground is above 2300mm.
Ɣ
When installing the steeve bolt, check if the install place can stand the weight 4 times of the unit’s.
,IQRWUHLQIRUFHEHIRUHLQVWDOODWLRQ5HIHUWRWKHLQVWDOOFDUGERDUGDQG¿QGZKHUHVKRXOGEHUHLQIRUFHG7KH
appliance shall not be installed in laundry.
Cautions:
There will be lots of lampblack and dust stick on the acentric, heat exchanger and water pump in dining
room and kitchen, which would reduce the capacity of heat exchanger, lead water leakage and abnormal
operation of the water pump.
The following treatment should be taken under this circumstance:
Ensure that the smoke trap above cooker has enough capacity to obviate lampblack to prevent the
indraft of the lampblack by the air conditioner.
Keep the air conditioner far from the kitchen so that the lampblack would not be indraft by the air
conditioner.
1.3.3 Caution for Installation
a. Important notice:
Ɣ
To guarantee the good performance, the unit must be installed by professional personnel according
with this instruction.
Ɣ
Please contact the local Gree special nominated repair department before installation. Any
malfunction caused by the unit that is installed by the department that is not special nominated by Gree
would not deal with on time by the inconvenience of the business contact.
b. Dimension of ceiling opening and location of the hoisting screw (M10)

Related product manuals