EasyManua.ls Logo

Greenwood Unity CV2GIP - Servicing; Maintenance; Commissioning & Inspection Record; Part 1: System Details and Declarations; Part 2 a: Installation Details

Greenwood Unity CV2GIP
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Wiring Details
Strip cable to correct lengths as shown in Figure 2 - Diagram 2.a.
Insert cable through cable entry point (A), and then clamp cable
using the cable clamp (B).
Push the wires into the terminal block (C) as per wiring diagram
(see section 2.7).
Tighten screws of the terminal connection.
Note: A facility to park the earth cable has been provided (D); as the fan
is double insulated no connection to earth is required.
2.6.8
(A)
(B)
(D)
(C)
Diagram 2.a.
(C)
Figure 2 - Wiring Details
230V
(C)
SELV

Other manuals for Greenwood Unity CV2GIP

Related product manuals