Unity CV2GIP / CV2SVGIP
Decentralised Mechanical Extract Ventilation (dMEV)
User / Homeowner Guide
Commissioning and Inspection Record:
Located on page 10 of this guide, should have been completed by the Commissioning Engineer.

Other manuals for Greenwood Unity CV2GIP

Question and Answer IconNeed help?

Do you have a question about the Greenwood Unity CV2GIP and is the answer not in the manual?

Greenwood Unity CV2GIP Specifications

General IconGeneral
ModelUnity CV2GIP
CategoryFan
InstallationWall/Ceiling
MountingSurface
Duct Diameter100mm
BrandGreenwood
Speed Settings1
Voltage220-240V
Frequency50Hz
MaterialPlastic
ColorWhite
Control OptionsPull Cord

Summary

Ventilation In Your Home

General Overview

Safety Warnings

Appliance use by children and persons with reduced capabilities requires supervision and understanding of hazards.

Siting Notes

Notes on siting fans in kitchens with gas or solid fuel appliances to prevent flue gas spillage.

Homeowner Controls

Controls Overview

Explains how to operate the Unity CV2GIP / CV2SVGIP control panel.

Control Panel Layout

Diagram and labels for the control panel features like Trickle Mode, Boost Mode, and smart functions.

View Fan Setup and Status

How to activate the panel and interpret the green lights for fan setup and status.

Change HumidiSMART Setting

How to activate or deactivate the HumidiSMART feature to monitor and react to humidity levels.

Change TimerSMART Setting

How to activate or deactivate the TimerSMART feature for boost period control based on switch-live activity.

Servicing / Maintenance

Commissioning & Inspection Record

Part 1: System Details and Declarations

Details system classification, manufacturer, model, serial number, and location of dMEV fans.

Part 2a: Installation Details

Checklist for installation compliance, ductwork type, controls description, and manual override locations.

Part 2b: Inspection of Installation

Visual checks for ventilator area, fan/terminal location, door undercut, protection removal, and ductwork installation.

Part 3: Air Flow Measurement and Commissioning

Details test equipment, records air flow measurements (high/low rates), and confirms control setup.

The Guarantee Period