EasyManua.ls Logo

GreenWorks Optimow 15 - Installing and Connecting the Charging Station

GreenWorks Optimow 15
562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREENWORKSTOOLS.EU
9
EN
The majority of the charging station must be inside the operating area.
The following two options are shown in figure:
Option 1 - Charging station is completely inside the operating area.
Option 2 - Charging station partly outside the operating area.
Installation
Position for the charging station as follows:
In a level spot out of direct sunlight
(The front end of the charging station must not be 5 cm higher or
lower than the back end.)
Within reach of a wall socket
(The low voltage cable is 10 m long.)
With at least 3 m in front of it and 1 m to each side
(Do not position in confined spaces in the operating area.)
INSTALLING AND CONNECTING THE CHARGING STATION
>1m
>1m
1m
35cm
>3m
10m
1.1.
2.

Table of Contents

Related product manuals