The entire charging station must be inside the operating area as shown
in the gure.
Installation
Position for the charging station as follows:
In a level spot out of direct sunlight
(The front end of the charging station must not be 5 cm higher or
lower than the back end.)
Within reach of a wall socket
(The low voltage cable is 10 m long.)
With at least 3 m in front of it and 1.5 m to each side
(Do not position in conned spaces in the operating area.)
INSTALLING AND CONNECTING THE CHARGING STATION
1m
>3m
10m
35cm