EasyManua.ls Logo

GreenWorks PSCS06B00 - Replacing Bar and Chain

GreenWorks PSCS06B00
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
MAINTENANCE
REPLACING THE BAR AND CHAIN (See Fig.13,14)
Remove the lock knob and chain cover.
The bar contains a bar stud slot that ts over the bar stud. The bar also contains a chain
tensioning pin hole that ts over the chain tensioning pin.
Place the bar onto the bar stud so that the chain tensioning pin ts into the chain tensioning
pin hole. Fit the chain over the sprocket and into the bar groove. The cutters on the top of the
bar should face toward the bar tip, in the direction of the chain rotation.
Replace the chain cover and install the lock knob. Tighten the lock knob nger tight only. The
bar must be free to move for tension adjustment.
Remove all slack from chain by turning the chain tensioning bolt clockwise, assuring that the
chain seats into the bar groove during tensioning.
Lift the tip of the bar up to check for sag. Release the tip of the bar, and turn the chain
tensioning bolt 1/2 turn clockwise.
Repeat this process until the sag no longer exists.
Hold the tip of the bar up and tighten the locked bolt securely.
FIG.13
FIG.14
BAR
CHAIN
COVER
CHAIN COVER LOCK KNOB
CHAIN COVER
LOCK KNOB
CHAIN
CHAIN COVER
SPROCKET
BAR STUD
BAR STUD SLOT
CHAIN TENSIONING
PIN HOLE
CHAIN
TENSIONING PIN

Related product manuals