OM/SM-DEE (CE)
19
turning the handle. To return the body to the upright
position, turn the crank clockwise.
7.2.6.2DEE/4T Kettle Only
Turn the handle on the tangent draw-off valve anti-
clockwise. After approximately 3-1/2 turns the valve
handle can be pulled forward so that full flow is
achieved. To close the tangent draw-off valve, push
the handle inward until the threads on the valve stem
engage. Turn the handle clockwise until the valve is
closed. Do not over-tighten since over-tightening may
damage the valve seat.
WARNING
DO NOT STAND IN FRONT OF THE KETTLE BODY
WHEN TILTING IT. BE CAREFUL TO KEEP HOT
CONTENTS FROM SPILLING. ENSURE PEOPLE
ARE KEPT AWAY FROM THE KETTLE WHEN
EMPTYING THE KETTLE.
7.2.7 Power Failure
If the power to the unit fails do not attempt to operate
the appliance until the electricity supply is re-
established.
When the power comes back on follow the steps in
Paragraph 8.2.1 Initial Kettle Operational Readiness
Check.