Shenzhen Growatt New Energy CO.,Ltd
11
Fig 6: Installation environment requirements
4.2 Basic Installation Requirements
Figure 7: Acceptable floor standing installation
Do not turn the PACK upside down, and keep the ground level.
4.3 Installation Required Tools
The following tools are required to install the PACK: