EasyManua.ls Logo

Growatt GroBoost - PV Linkage Mode Configuration

Growatt GroBoost
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Figure 7-3
Photovoltaic linkage mode:
Select the load to be controlled, select the priority, enter the linkage name,
confirm whether the linkage meter is correct, turn on the linkage enable switch,
control linkage execution time, and set linkage tasks.
Linkage details need to save at least one load, click on the load to enter
the advanced settings:
* Recommended settings: