Figure 7-3
② Photovoltaic linkage mode:
Select the load to be controlled, select the priority, enter the linkage name,
confirm whether the linkage meter is correct, turn on the linkage enable switch,
control linkage execution time, and set linkage tasks.
Linkage details need to save at least one load, click on the load to enter
the advanced settings:
* Recommended settings: