EasyManua.ls Logo

Grundfos DME AR Series - Calibration Procedures; Direct and Check Calibration

Grundfos DME AR Series
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English (GB)
30
7. Calibration
It is important that the pump is calibrated after
installation to ensure that the correct value (ml/h or
l/h) appears in the display.
The calibration can be carried out in two different
ways:
Direct calibration.
The dosed quantity of 100 strokes is measured
directly. See section 7.1.
Check calibration. See section 7.2.
Fig. 26
Operating display
without changes
Set value.
See section 7.2
Operating display Operating display
The pump
performs 100
dosing strokes

Related product manuals