CM - Instalación
Introducción
Eliminación del inhibidor de la oxidación
AD73E7A8D7?AH3>WDEFGE73B>3EF;5E5D3B7DFAD7?AH7?AEFA8F:7DGEF;@:;4;FAD3@6F:7@GE7-AD3@AF:7D
' @7GFD3>679D73E7DFAEBD3K3>>F:7I3K5AH7DE3@6AF:7D@A@B3;@F76EGD8357EF:3F:3H7477@5A3F76I;F:DGEF
;@:;4;FAD#7F;FEA3=8AD387I?;@GF7E478AD7D7?AH;@9;F*:7@GE7E:ABFAI7>EFAD7?AH7;FADF:;5=3BB>;53F;A@EA8
DGEF;@:;4;FADGE73B>3EF;5E5D3B7DFAD7?AH7;F
E587:<*6< A@AFGE7E5AF5:4D;F7AD?7F3>E5D3B7DEF:7E7I;>>E5D3F5:F:7I3K5AH7DEGDF:7D?AD7FA3HA;63@K
5A@F3?;@3F;A@A8F:7I3K5AH7DE73>EI;F:F:7EF;5=KD7E;6G7A@AF?AH73@KA8F:73J7EG@F;>3>>F:7DGEF;@:;4;FAD
:3E477@D7?AH76
EF7BDA576;?;7@FA>79G;3DP3FD3HQE67>3
;@EF3>35;T@67G@,$
.::*52.6<*;:.9=.:2-*;
V %;H7>67?3CG;@;EF367BD75;E;T@
;H;E;T@
V 3DD367BDG74367:GE;>>A67BD75;E;T@
#3D9A
V M7@5:G87KFD;@CG7F7
V #>3H7
V $76;63675;@F3
V A;@6;536AD67?;5D3
V '3D3?PCG;@3E67,'DA436AD67
D757BFP5G>A7>Q5FD;5A67,5A@
6;39@TEF;5A[
V '3D3?PCG;@3E67,'DA436AD67
D757BFP5G>A7>Q5FD;5A,5A@
6;39@TEF;5A[
CM-1 Installation
Page 1 of 16 pages
Question and Answer IconNeed help?

Do you have a question about the Haas CM Series and is the answer not in the manual?

Haas CM Series Specifications

General IconGeneral
BrandHaas
ModelCM Series
CategoryPower Tool
LanguageEnglish

Summary

Introduction

Required Tools

Lists tools needed for VMC installation.

Rust Inhibitor Removal

Air Connection

Electrical Connections

Initial Control Inspection

Inspect electrical panel, breaker, and components for damage before connecting power.

1-Phase Machine Power Wiring

Connect power leads for 1-phase machines to main circuit breaker terminals L1 and L3.

3-Phase Machine Power Wiring

Connect power leads for 3-phase machines to main circuit breaker terminals L1, L2, and L3.

Measure Supply AC Voltage

Measure AC voltage at the main circuit breaker for 1-phase and 3-phase configurations.

Verify Transformer Tap Settings

Check transformer taps to match the measured input voltage for proper operation.

Connect Transformer Power Input

Connect input power cables to correct transformer T5 connectors based on voltage.

Apply Power and Check Gauges

Turn on power and verify DC and AC line voltage readings on the diagnostics screen.

Activation