3) Use separate thermal insulation pipes for gas and liquid refrigerant pipe.
7.8 Cutting and Flaring work of piping
Pipe cutting is carried out with a pipe cutter and burs must be removed.
After inserting the are nut, aring work is carried out.
7.9 On drainage
Please install the drain hose so as to be downward slope without fail. Please don t do the drainage as shown
below.
Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out thoroughly to
outdoor. In case that the attached drain hose is in a room, please apply heat insulation to it without fail.
Flare tooling die
Pipe Pipe diameter Size A (mm)
Liquid side 6.35mm(1/4") 0.8-1.5
Gas side
9.52mm(3/8") 1.0-1.5
12.7mm(1/2") 1.0-1.5