Note: Obstacles should be 2000mm off the top of the out
Obstacles nearby should be 400mm lower
the unit.
1. Handing
As there is no protective package for the outdoor unit,so
points merit attention:
(1) When forklift is used, insert the fork into the holes in
the base plate.
(2) When crane is used, lift the unit with 4 pieces of steel
diameter above 6 mm.
(3) Put protective materials between the cable and the
deformation and damage of the surface.
2.Mounting
(1) The distance between two connections must not be
20mm.
Warning
Selection of installation site
It should be installed at places where it is firm enough to withstand the weight of the air
falling.
Typhoon and earthquake prevention. It should be installed according to specific
requirements.
Inasppropriate installation may lead to accidents.
(1)During installation, connect the outdoor unit and align
surface(See the figure on the right).Mount
device on the external side of
instructions for
electric distribution device.
(2)To ensure good performance of the machine and facili
and maintenance, adequate space must
the right).
Installtion space
Blow out
Air inlet
Air inlet
maintenance plate
Over 300mm
Over 20mm
Over
20mm
Over
20mm
Over
20mm
Over
1000mm
(front side)
Air inlet
M12 foot screw bolt
4 screws each unit
Rope
Protection cushion
Base panel
Rope
conditioner to prevent
the mounting
the electric distribution
the unit in accordance to the installation
tate installation
be reserved (See figure on
door unit.
than the top of
the following
rope with
unit to prevent
Refer to the following figure for the distance between the
foundation bolts.
(2)When the refrigerant pipe is connected from the bottom of
should be raised at least 500mm(see the
figure below)
(3)In snowy regions,snow-proof facilities should be used(see
the figure below).
(Poor snow-proof facilities may lead to damge.To avoid
unit should be raised and snow-proof
inlet and outlet.)
(4)During installation,anti-vibration rubber pads should be used
machine and the bracket.
Air inlet snow-proof cover
Air outlet snow-
proof cover
Air inlet snow-
proof cover
Refrigerant tube
Above 500mm
Through hole*15x20*
1100
less than
the unit,the unit
inconveniences,the
covers should be installed at the air
between the
7.2 For series 96
-183-
Installation

Other manuals for Haier HBU-28CH03

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Haier HBU-28CH03 and is the answer not in the manual?

Haier HBU-28CH03 Specifications

General IconGeneral
BrandHaier
ModelHBU-28CH03
CategoryAir Conditioner
LanguageEnglish

Related product manuals