Folie 4
1. Note
Caution:
De-energize the machine when working on it (disconnect battery plug) except for
current or voltage measuring.
Only loosen the screws when replacing the strip circuit breaker. Do not remove
them entirely to avoid the risk of short-circuit.
Insert the new strip circuit breaker entirely and evenly under the screws.
Measure the start-up and the operating voltage after repair in order to detect
eventual faults.
The generally applicable legal provisions for safety and for prevention of
accidents have to be respected when working on the machines.