G. C. APPLIANCE No. 41 333 77 Ace G. C. APPLIANCE No. 41 333 78 Ace High
0086
Ace and Ace High
Wall Mounted Gas Combination Boiler
Installation and Servicing Instructions
To be left with user adjacent to gas meter
EC 0087/BM/37

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Halstead Ace High and is the answer not in the manual?

Halstead Ace High Specifications

General IconGeneral
ERP RatingA
CH Output (kW)24
DHW Output (kW)24
Flow Rate (l/min)9.8
Output24kW
Warranty2 Years
MountingWall-mounted
Fuel TypeGas
Boiler TypeCombination

Summary

Technical Specifications of Ace Boilers

Gas Categories and Appliance Classification

Appliance classification according to EN 483 and EN 625 for gas categories.

Performance Data and General Specifications

Performance data, minimum clearances, overall dimensions, and general specs.

Installation Requirements

Statutory Requirements and Boiler Location

Legal requirements and guidelines for boiler location.

Flue Terminal Position

Recommendations for the correct positioning of the flue terminal.

Ventilation Requirements and Gas Supply

Ventilation Requirements

Requirements for air supply and ventilation for the appliance.

Gas Supply

Guidance on gas supply requirements, pipework, and governors.

Domestic Hot Water System and Electricity Supply

Installing the Appliance

Mounting the Boiler and Service Connections

Mounting the Boiler

Procedure for lifting and securely mounting the boiler onto the wall bracket.

Service Connections

Connecting central heating, DHW, gas, and water services.

Gas Connection and Pressure Relief Valve Pipe Connection

Specifics for gas connection and pressure relief valve pipe.

Air/Flue Duct Installation

Flue Restrictor and Duct Installation (Inside)

Air/Flue Duct Installation (Outside)

Wiring Instructions and Electrical Connections

Wiring Instructions

Connecting the appliance to the electrical supply and external controls.

Commissioning and Testing

Filling the Water Systems

Procedure for filling the central heating and domestic hot water systems.

Commissioning the Appliance and Fascia Panel

Commissioning the Appliance

Steps for commissioning the appliance, including burner pressure checks.

Operational Checks and User Handover

Routine Servicing Procedures

Component Servicing and Post-Service Procedures

Fault Finding

General Checks and Diagnostic LEDs

Initial checks and interpretation of diagnostic LEDs for faults.

Ignition, DHW, and Central Heating Faults

Troubleshooting specific ignition, DHW, and CH faults.

Replacement of Parts

Gas Control and PCB Burner Pressure Setting

Component Replacements: Air Switch, Thermostat, PCB

PCB CH Heat Input Setting and Microswitch

Thermistors - DHW or Heating

Water Flow Regulator and DHW Heat Exchanger

Pump and Pressure Relief Valve