EasyManua.ls Logo

H&S 4112 - Preparing for Operation

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-16-
1. Adjust the tractor hitch (13 to 17 inches above ground) and
attach rake to tractor with a hitch pin with a safety locking
device.
2. There are ten di󰀨erent positions to adjust the hitch on your
new rake. Hitch should be adjusted so main frame of the rake
is level or parallel to the ground.
3. Remove weight from lift jack. Remove jack from pipe and
place on convenient storage mount located on the front top
of pole.
PREPARING FOR OPERATION
4. Connect hydraulic hose for raising and lowering rake wheels from rake to a double acting valve on the
tractor.
5. Connect hydraulic hoses for opening and closing the rake to a double acting valve on the tractor.
6. Connect 7-pin electrical connector to tractor (If equipped with optional lighting).

Related product manuals