EasyManua.ls Logo

HANGCHA 78XEN - 5 Checks before operation; 5.1 Check the machine

HANGCHA 78XEN
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
5 Checks before operation
5.1 Check the machine
In order to operate the machine safely and keep it in good condition, a thorough check must be
made before it is started.
Basic principles
The operator should be responsible for the pre-operation check and routine maintenance.
The pre-operation check is a visual inspection process, which is performed by the operator
before each work shift. The purpose of the pre-operation check is to find obvious problems with
the machine before the operator performs the function test.
The pre-operation check can also be used to determine whether routine maintenance is
required. The operator can only perform the routine maintenance items specified in this manual.
Refer to the list attached to the machine and parts and check each item and location for
changes, damage, looseness or missing parts.
Do not use damaged or altered machines. Mark the machine and stop using it if any damage or
any changes to the original machine are found.
According to the manufacturer's regulations, only qualified service technicians can repair the
machine. After the maintenance, the operator must perform another pre-operation check before
performing the function test.
According to the manufacturer's regulations and the requirements stated in the duty manual,
regular maintenance and inspections should be performed by qualified maintenance technicians.
Check items
Ensure that the operation manual and maintenance manual are intact, easy to understand, and
kept in the storage case on the platform.
Ensure that all labels and signs are clear and visible and stuck in the proper positions. See the
section “Labels and Signs”.
Check for any leakage of hydraulic oil and its level. Add hydraulic oil as needed, do not overfill.

Related product manuals